JET/Asian 24" & 28" Band Saw WBS-24 WBS-28 Manual

Price:

$17.50

Availability:

In Stock

Add to Cart

Manual Description

Number of Pages: 10

This is a reproduction, not a photocopy, of an original JET WBS-24 WBS-28 24" and 28"Jointer Instructions and Parts Manual. This manual contains general operating instructions, adjustments, maintenance, and a complete set of exploded view diagrams of the parts with description.

PLEASE READ:

This machine was produced in Asia, and was sold under different brands e.g. Grizzly, Enco, MSC, etc. To help identify your machine I am posting a picture plus a specification sheet of the size and speeds of the machine. I do not have model numbers of the other companies that this machine was sold under. I have provided all the information I have. The only way I can help you find which manual fits your machine is to send me a picture by email to ray@ozarkwoodworker.com or postal mail.

JET WBS-24 WBS-28

JET WBS-24 WBS-28


Overview

I have collected this information for many years and have found the information they contain to be priceless in using and setting up the machines properly. I believe this manual will be a valuable resource of knowledge that will provide a lot of helpful information that is often hard to find. My manuals are not photocopies. I maintain a high standard of quality in my reproductions. Most of the manuals I reproduce look better than their originals. I have professionally digitally edited every page, and removed stains, wrinkles and handwriting. All of the manuals are printed on thick white paper to withstand shop wear and tear; they are then comb bound with heavy cover pages so they lie flat on the workbench.